Wednesday, March 23, 2011

What Will 2011 Bring to Energy in Southeastern Europe? (Part III)



In response to what I posted earlier to that online group, someone from Croatia recently asked the following question there:

Hi Mark,
situation in Japan seems like besides "lost x years" there is "lost space", too. How do you expect it to affect global and in that regard SEE economy in the 1 year term?


Here is what I responded (slightly edited):

_____,

I think it is still too early to tell how great the impact of the events in Japan will be on Southeast Europe’s economy and the energy sector in the short (1 year) term. As of this date the information that is being published seems to indicate that a corner has been turned at Fukushima Daiichi, that perhaps all 5 of the charged reactors (unit 4 was emptly at the time of the quake) and all 7 spent-fuel pools there are cooling down. I have my doubts about the veracity of this, but that is the gist of the Japanese news. (The most frequent reports – though rather dry and devoid of any colorful detail – can be found at “TEPCO 福島第一原子力発電所 プレスリリース-ホームページ掲載情報” at http://www.tepco.co.jp/nu/f1-np/press_f1/2010/2010-j.html, and much of the same information can be found in English at the IAEA’s “Fukushima Nuclear Accident Update Log” at http://www.iaea.org/newscenter/news/tsunamiupdate01.html.) As for my own thoughts on the safety record of Japan’s nuclear industry, based in part on my experience working as an engineer for a couple of Japanese companies, see my recent blog entry “What I Wrote in October 2010 about the Poor Safety Record of Japan’s Nuclear Power Industry”.

Last week, when the roofs of the reactors were exploding and people were just beginning to talk about soaring temperatures in the spent-fuel pools, it seemed like the much-touted “nuclear renaissance” was over. At that point any talk of moving forward on Cernavoda 3 & 4 (Romania), Belene 1 & 2 (Bulgaria), Paks 5 & 6 (Hungary), Krško 2 (Slovenia), as well as the 8 nuclear plants that Berlusconi’s administration wants to build in Italy (one of the 45 sites under consideration for which is readily visible from my apartment window) seemed absurd. (See http://www.world-nuclear.org/info/inf17.html for information on proposed nuclear plants.) But if the situation at Fukushima Daiichi stabilizes, and they are able to remove bad nuclear news from Japan from the news cycle quickly enough, then a year from now the “nuclear renaissance” might well be on track again. Nevertheless, if worrying levels of radiation begin to be reported on the western coast of the U.S.A., then there will be no forward movement on these nuclear projects.

Any forward movement on these nuclear projects, obviously, would not lead within one year to any increase in nuclear TWh generated. But the idea that dozens of GW of new nuclear production might be in the pipeline could discourage those who are considering investing in other large energy projects (such as oil & gas pipelines, or coal-fired power plants). Also, we seem to be seeing in Italy that the big business lobby (Enel and the big-business-oriented chamber “Confindustria”) is trying to get the government to reduce its support to renewable energy sources so as to free up more money for nuclear energy (which is low-carbon, though not renewable).

That is the direct impact of the nuclear safety side of the recent events in Japan. But aside from the nuclear safety issue, the destruction, power outages, and food quarantines caused by the earthquake and tsunami will have a generalized impact on the world economy as a whole. See, for example, the article “Japan Quake Shakes U.S. Treasury Bond Market: Get Ready for Financial Meltdown”, at http://www.marketoracle.co.uk/Article27004.html, where they write the following:

“In this issue, we anticipate that the sudden shock experienced by the Japanese economy will lead not only to the halt in US T-Bond purchases by Japan, but it will force the authorities in Tokyo to make substantial sales of a significant portion of their US Treasury Bond reserves to finance the enormous cost of stabilization, reconstruction and revival of the Japanese economy.”

The article maintains that the Japanese earthquake crisis will boost inflation worldwide, although they base a portion of the expected inflationary effect on the hypothesis that the Fukushima Daiichi situation – which at that time was rapidly worsening – will lead to a complete abandonment of nuclear construction plans worldwide, and a resulting long-term increase in the price of oil.

I had not yet heard of the Japan earthquake and tsunami when, on the morning of 11 March, I posted personal updates on LinkedIn with links to the following two articles:

The Tragic Failure of "Post-Communism" in Eastern Europe
by Dr. Rossen Vassilev

Bond Market Anticipates Greek Default
by Mike Shedlock

The first of these would seem to augur the possibility of complete political and economic disruption in Eastern Europe (including, to a lesser extent, former Yugoslavia) if the present U.S. financial meltdown, with the Fed’s resulting policy of monetizing the U.S. debt, continues to lead to an outflow of U.S. funds to world markets and a further rise in commodity prices (including oil and foodstuffs) such as has already sparked unrest in Tunisia, Egypt, Bahrain, etc.

The second article indicates what many analysts have been saying for a while: the global recession (“crisis”) is not over, but the vast debts of the private sector (banks) have simply been taken on by the public sector (governments), and the public sector worldwide is now no longer able to support that level of debt. So we can expect sovereign defaults in a number of countries, such as Greece, Ireland, Portugal, and Japan. (Indeed Japan was already high on the default watchlist even before the earthquake.) The events in Japan will certainly lead to 1) considerable new debts for Japan, and 2) a rise in commodity prices both to make up for a decline in production from Japan and to begin the rebuilding of Japan. So although the price of oil was already on its way upward even before the earthquake, the events in Japan guarantee that it will remain high, while the events in Libya will provide additional upward pressure.

All in all, I think that the events in Japan will have the following effects on energy and the economy in general in Southeast Europe over the next twelve months:

1)   Continuing upward pressure on all commodity prices, which should lead to economic slowdown, but also upward pressure on the price of oil, which should encourage investment in other sources of energy.

2)   Higher inflation worldwide, which will lead to economic slowdown, sovereign defaults, and political unrest, which will all lead to further economic slowdown.


After posting the above to that group yesterday, this morning I ran across the following excellent article by James Quinn about the economic effects – in Japan and globally – of the earthquake and tsunami in Japan:

Tsunami Accelerates Japan's Economic Meltdown Driven by Debt and Demographics
by James Quinn
http://www.marketoracle.co.uk/Article27101.html

A couple of excerpts:

Japan is a one trick pony that just broke two legs and is waiting to be put down [i.e., put to sleep, killed off gently]. They have experienced a two decade long recession. Their stock market is still 70% below its 1990 peak. They have no natural resources. They allow virtually no immigration. And their population is in a death spiral. The one and only thing they have going for them is their phenomenal ability to manufacture high quality products and export them to the rest of the world. The earthquake and tsunami that struck Japan severely damaged their just in time manufacturing machine. A surging yen would destroy their export machine by making their products more expensive. Hundreds of high tech Toyota, Honda, and Sony factories are shut. Four hundred miles of ports and harbors have been wiped out. There are rolling blackouts, with one million households without electricity. Over 500,000 people are still homeless.”


Japan is trapped, with no way out. They will need to issue hundreds of billions in new debt, which cannot be bought by its citizens, pension funds, or insurance companies. How many foreign investors will buy a 10 Year Japanese government bond paying 1%, knowing that Japan wants to weaken its currency? NONE. The only choices are to raise interest rates to attract buyers or print more money. With an already suffocating level of debt, they can't allow interest rates to rise. They would choke on the interest.

The Bank of Japan will follow the same script as Ben Bernanke. They will print new Yen and buy the newly issued debt. What an original idea. Japan is caught in a debt stranglehold and demographic nightmare. Their currency will ultimately collapse like a nuclear reactor after a tsunami. When Japan defaults on their debt, the pain will be intense, as they will be throwing their own aged population under the bus. America, on the other hand, will throw the whole world under the bus when we default.

The Japanese own $886 billion of US Treasuries and have bought $256 billion of our debt since October 2008. Timmy Geithner will need to issue $1.5 trillion of new bonds per year. Japan will no longer be a buyer. They will be a seller. This will put upward pressure on U.S. interest rates. Japan's reconstruction needs will put pressure on commodity and energy prices. Production and supply problems for Japanese parts and goods are already creating problems for GM and other car companies in the U.S. Lack of supply leads to higher prices. The great earthquake/tsunami/nuclear meltdown of 2011 will result in more quantitative easing in Japan and the U.S.





Photo by 9m2ji1etu from Panoramio


 

Monday, March 21, 2011

What I Wrote in October 2010 about the Poor Safety Record of Japan’s Nuclear Power Industry

On 28 September 2010 I noticed on LinkedIn that one of my contacts there had commented on a post to a LinkedIn group that we both belong to, and I joined in on the discussion.  The original post was entitled “Thought you might be interested - Philippines acting fast on nuclear energy development”.  The entire thread has since been deleted by the author – and I can imagine why – so I no longer have his original message or the response of Andrew, my contact, in which Andrew replied that building so many GW of nuclear power so quickly would be very difficult.  I also lack the author’s final response.  What I give below are my first response to the thread, the author’s reply, and my second response (slightly edited).


Comment by me, 2010-09-28 15:20

Andrew is right about the time restraints.  In addition, isn't the Philippines a rather seismically active area?  Also, typical nuclear reactors run around 1 GW, so if they are going to be facing an electricity shortage of 3 GW within 2 years then they would need at least 3 reactors right away.  (According to Wikipedia, the reactor at the Bataan Nuclear Power Plant was designed to generate only 0.62 GW.)  Also, don't nuclear reactors have to go offline from time to time for routine refuelling and maintenance?  Unless the grid had sufficient backup capacity, that could make their brownouts much worse than they are now.


Comment by original author, 2010-09-29? 10:54

Hi Mark, actually the head of the National Institute of Geological Sciences has recently finished his (re)study on the potential seismic complications on the site of the BNPP and he concluded that there is little danger.

If you recall, Japan is much, much more seismically active and it has safely been operating over 50 nuclear plants for over 40 years now.

Re maintenance, you may want to look up the difference between base load capacity and overall capacity. You can look up the latest Philippine Energy Plan to see where in the power mix the government's expert team was planning to have nuclear contribute about 10% of capacity.

Would you have any solutions that address seismic issues for power generation such as for geothermal? I believe these would be pertinent particularly for many types of power generation, especially considering some types of power plants need to be built near centres of seismic activity?


Comment by me, 2010-10-06 12:41

____,

You write, “If you recall, Japan is much, much more seismically active and it has safely been operating over 50 nuclear plants for over 40 years now.”

Well, the safety of Japan’s nuclear power plants is subject to debate.  Clearly there have been no Chernobyl events, and apparently no Three-Mile Island events, but there have been any number of other accidents.  You can read the following in an article about a magnitude 6.8 earthquake near Japan’s largest nuclear facility, Kashiwazaki-Kariwa, in July 2007 (http://www.washingtonpost.com/wp-dyn/content/article/2007/07/16/AR2007071601712.html):

“Though Japanese nuclear plants, like U.S. plants, are built to withstand powerful earthquakes, Bloomberg News reported the unit had two cracks. But Hasegawa said the pool was no longer leaking and there was no hazard to the fuel rods. The cooling pool is 33 feet deep, and about 23 feet of water lies over the spent fuel rods.

Experts were cautious about accepting Tokyo Electric Power's assurances. Japan's nuclear power industry has a history of covering up incidents. In March, Tokyo Electric Power, Asia's biggest utility, said it would delay completion of two nuclear reactors after admitting that it covered up an accident in 1978. In 2002, the company shut all 17 of its reactors after admitting that employees had falsified nuclear safety documents since the late 1980s.

Safety concerns are one reason the company's plants have operated at less than 70 percent of capacity. At the time the quake hit yesterday, three of the seven units at Kashiwazaki-Kariwa were shut down for inspection. The other four units shut down automatically after the quake, the company said.”

At http://www.joewein.de/tokaimura.htm, they say this about the Tokaimura criticality accident in 1999:

“The Tokaimura accident is the third most serious accident in the history of nuclear power, after the 1986 Chernobyl accident and the 1979 Three Miles Island accident.

… Critics pointed out nuclear facilities such as this fuel factory are rarely ever checked once they receive the initial operating license.

Families living near the plant were temporarily evacuated and 300,000 people were asked to stay indoors for more than a day. Later neighbours and employees were tested for radioactive contamination. 63 people were identified as having been exposed, amongst them 14 workers of JCO (who poured boron into the reaction vessel to help put out the nuclear chain reaction) and the two victims who later died.

The Tokaimura accident was the third serious nuclear accident in four years. In 1996 a coolant leak and subsequent fire caused an emergency shutdown of the plutonium-fuelled reactor Monju. The following year a fire and explosion in a nuclear waste processing facility in Tokaimura exposed 35 people to radiation.”

Finally, at http://www.joewein.de/mihama.htm we read this about the 2004 Mihama accident:

“The accident happened when the reactor was about to undergo routine maintenance. The accident was caused by a bursting steam pipe in the non-radioactive part of the reactor. In 27 years of operation that 56 cm diameter pipe had not once been checked for corrosion, let alone replaced. By the time it burst, its walls had worn down from an initial 10 mm of carbon steel to a mere 1.4 mm. Regulations required the pipes to be replaced when the walls were eroded to a thickness of 4.7 mm. Nine months before the accident a subcontractor company had alerted the operators to the need for inspections, but the warning was ignored.”

Most of these accidents are not due to earthquakes, obviously.  But they show that there is a pattern of laxness, not in the initial design and construction – though Wikipedia writes about Bataan that “[f]ollowing the 1979 Three Mile Island accident in the United States, construction on the BNPP was stopped, and a subsequent safety inquiry into the plant revealed over 4,000 defects” – but during the operating phase.

You ask, “Would you have any solutions that address seismic issues for power generation such as for geothermal? I believe these would be pertinent particularly for many types of power generation, especially considering some types of power plants need to be built near centres of seismic activity?”

Well, although some individual plants of various types may need to be built in areas that are seismically active, the only _type_ of power plant that I am aware of that always _needs_ to be built near centres of seismic activity is geothermal.  On the other hand, both geothermal and large-scale hydroelectric can _induce_ seismic activity. (See http://www.probeinternational.org/catalog/content_fullstory.php?contentId=6809&cat_id=7 and http://online.wsj.com/article/SB123391567210056475.html.)

I think the engineering expertise and the materials exist to build power plants that can withstand strong earthquakes without releasing damaging materials to the environment.  But there are also economic concerns, and this gives the developers of the project, and the politicians and regulators that they have won over to their side, incentives to streamline the process and to cut costs in order to make energy prices more “competitive”.  In the case of BP’s Macondo Prospect spill in the Gulf of Mexico, there were numerous regulatory roadblocks and physical safety interlocks in place to prevent it from happening, yet it happened.

The particular challenge of nuclear power, to me, is the fact that damaging releases are not immediately evident to the senses – hence the Soviets were able to deny for days that there was any damaging release from Chernobyl until radiation began being detected in Sweden – and often the nuclear industry in a country is so small and specialized that there is the danger of an excessively cozy relationship between power plant operators and the regulators who (ostensibly) should oversee them.

I read in a report of March 2010 evaluating Ireland’s future energy options that one of the major costs to building a first nuclear plant in Ireland would be the need to create an entire corpus of regulations and to create and train an entire regulatory agency (whose entire livelihood would depend, obviously, on the continued operation of that nuclear plant).

The situation would be similar for the construction of a first nuclear power plant in the Philippines.  I recall that when I was visiting Manila in 1986 there had recently been introduced a law banning smoking in public places in Quezon City .  But almost all the men in Quezon City were used to smoking in public.  So everyone concluded that the law had been instituted just so that policemen could go around catching smokers so as to elicit bribes from them so that they would not have to pay fines.  I know that a lot has changed in the Philippines since then, and yet when I think of the [meager] amount of actual control that the central government is able to exercise in places like Diwalwal, well…

In short, it is hard for me to imagine an honest, uncorruptible nuclear industry and nuclear regulatory agency being created from zero anywhere in the world with the potential to operate a nuclear power plant risk-free in a seismically active zone in anything less than 10 years.

Even near here in Italy where a company is building a modest wind farm of 30 MW (€ 45 mln) for a fully respectable firm they are having problems with car bombs, death threats, major arson, and bribery.


In his final response – which is no longer available – the author proclaimed that regardless of safety considerations these nuclear plants would be built, so if I wanted a part of the business I had better be present at their meeting in order to have “a place at the table”.